|
|
|
We are the owners of a compost site in Bulgaria in the town of Slavyanovo. In the area where we are located, enough straw and poultry manure are produced to ensure the production. We have been carrying out this activity since 2005. On an area of 6 acres. In 2014, we purchased an adjacent 25 acres. We designed compost production 3rd phase. We currently have all the necessary permits and distance from the settlement. To date, the site is operational and producing phase 2 compost. We have the following equipment Area of the property - 31 decares. Own substation. Diesel generator Scale 50 tons. Building with thermal panels 2.5 acres in which 10 tunnels of stainless panels are built for 70 tons of compost 2nd phase and 55 tons third phase. Dimensions 3/3/27.5m 2 pcs. winch on both sides of the tunnels. Filling cassette. The ten tunnels are equipped with Fancom fans and agrocomputers, probes, heat exchangers, etc. Machine for planting briquettes 4 bunkers with dimensions 6/25/6 Basin for mixing the raw materials 2 own water sources Water storage tank 300m3 The required number of front loaders for the activity. Hopper FILLING plus FILLING It has storage areas for raw materials The capacity of the site is currently between 300 and 400 tons of 3rd phase compost per month. We can guarantee the realization of this volume in Bulgaria. Romania is 100 km away. From the place , there are also potential customers. We offer 3 options 1. Purchase of the site. 2. Type of contractual partnership 3. Partial payment and the difference in compost. The company has 19 halls of 420 m2 for growing mushrooms, also with a harvester for putting in the compost We remain available for any questions.
e-mail:
Adres poczty elektronicznej jest chroniony przed robotami spamującymi. W przeglądarce musi być włączona obsługa JavaScript, żeby go zobaczyć.
|